Multi – purpose area under the roof cover
origin : The facility is a multipurpose area with a roof cover between Thammayan 84 Building and Prarachuprathamp Building. It is used for school daily assemblies in the mornings and as a sports arena when students learn P.E. Mr.Ampai Phusripong was the architect.
Budget : 4,700,000 Baht.
Building began in February 2000 and was completed on June 20, 2000.
|
Untitled Document
Winit Minimart
origin : The objective of use this building was to provide merchandise for the students and staff such as stationary and students texts. Therefore, the Minimart project also allowed students to learn and experience how to manage and practice the process of Marketing Cooperation. Winit Minimart is a business run by teachers, students and school.
Budget : Primary budget was 89,680 Baht and renovated with the budget of 335,000 Baht.
1991 and renovated in 1999 – 2000.
|
Chaleamprakeat’ 72 Pansa Building
The (origin) source of the project :
The objective of this project was to build Chaleamprakeat’ 72 Pansa Building as a 3-story multi-purpose building; 22 meters wide, 44 meters long and 3,894 square meters is the total area this building.
1st floor – Cafeteria which is able to hold 1,000 people in a total area of 1,298 square meters and 330 square meters of a terrace level which is used for Her Royal Highness Princess Maha Chakri Sirindhorn’s office, a reception room and a small meeting room.
The budget for the Chaleamprakeat Building Project: The Private School Board of Education Office contributed the 17 million baht from 1999’s annual budget and Winitsuksa School contributed for 13.7 million baht. The total budget was 30.7 million baht.
|
Pra Buddhaworayan Shrine
origin : This is a hall where Pra Buddhaworayan image was kept. It was built to commemorate the school founder and to celebrate the school’s found 50 anniversary in 1996.
Budget : 3,433,291 Baht.
Started to build in 1997 and completed in 1998.
|
Bua – On Hall
Origin : Bua – On Hall used the Department of Elementary Education’s blueprint (pattern). The hall was built to celebrate the school’s 35th- anniversary on October 15, 1980. It was a multi-purpose building used as a meeting hall and as a canteen for the students (22 m x 32 m). The building was moved in order to use the original area to build Chaleamprakeat Building in 1998.
Budget : 1,160,000 Baht (school budget) and 1,050,000 Baht. (to move this building.)
Built : 1980 and moved in 1998.
|